Welding

Welding is one of the most in-demand services offered by Grossner, commonly used for assembling and joining steel components in industrial plants, distribution networks, and fire suppression systems. Welding operations are performed on carbon steel pipes and fittings, both at our premises and, depending on the project's scope, directly on-site.

We use approved welding procedures — MIG/MAG and manual electrode welding — on materials certified according to EN 10255 and SR EN 10217. Every welder in our team is ISCIR authorized, and critical joints can be accompanied by a visual inspection report or pressure test upon request.

The service is integrated into the prefabrication workflow: we can deliver welded assemblies ready for installation, significantly reducing on-site working time and the risk of installation errors.

Request a quote
Type Service Name Price per operation*
WELDING Butt weld DN15 – DN50 35.00
WELDING Butt weld DN65 – DN100 55.00
WELDING Butt weld DN125 – DN200 85.00
WELDING Branch / nipple weld on pipe 45.00

*Prices are in RON + VAT. The final price depends on wall thickness and quantity. Contact us for a personalized quote.

Grossner Daily Activity

Our daily activity means organization, production and fast deliveries for industrial projects across the country.

Here are real images from our warehouse, production and order preparation:

  • unloading goods
  • prefabricating pipes and distributors
  • preparing deliveries
  • production for industrial installations

All backed by a solid stock and a team focused on efficiency and speed.

Galvanized steel pipe AVAILABLE FROM STOCK IMMEDIATELY – over 250,000 m

24.09.2026

Hydraulic separators – AVAILABLE FROM STOCK

13.05.2026

Curtea Grossner - inceputuri!

12.10.2017

Curte Grossner 2026!

11.09.2026

Fittings warehouse – order processing!

02.09.2026

Steel manifolds D.1200 – 5000-litre water tanks

13.05.2026

Grooved fittings

13.05.2026

Grossner supported excellence in computer science by sponsoring the national stage of the “Urmașii lui Moisil” 2026 competition, held in Bacău.

15.07.2026

Pipe handling

13.05.2026

The TIMIȘEȘTI–TÂRGU FRUMOS project SUCCESSFULLY COMPLETED – spiral welded pipes

13.05.2026

Serviciile noastre!

13.05.2026

Top service – GROOVING!

08.09.2026

Impressive pipe stock – 6000 TONS!

03.09.2026

Steel pipe – PERMANENT STOCK – ready for delivery anywhere in the country!

08.09.2026

Vopsire in camp electrostatic - Rasuflatoare gaz metan - fabricare Grossner

23.07.2026

Painting metal cable trays for electrical cables

13.05.2026

Vopsirea tevilor in camp electrostatic!

09.09.2026